首页> 外文会议>ASME International Conference on Ocean, Offshore and Arctic Engineering >PEAK ACCELERATIONS OF EQUIPMENT WITHIN A BUNDLE TOWHEAD DURING PILE DRIVING OPERATIONS
【24h】

PEAK ACCELERATIONS OF EQUIPMENT WITHIN A BUNDLE TOWHEAD DURING PILE DRIVING OPERATIONS

机译:桩驾驶运行期间束拖头内设备的峰值加速度

获取原文

摘要

Pipeline bundles are towed to site between towhead manifold structures which are designed to contain all the manifold valve-work and control equipment. The towhead is a space frame that not only supports and protects the on-board equipment during service but also allows the attachment of temporary buoyancy units that are necessary for the towing and controlled ballasting operations during installation. Pre-installed equipment within the towhead space-frame must be operable following the bundle on-shore transportation, launch, offshore tow and pile driving operations that are necessary to secure some towheads to the seabed. The analysis work reported in this paper focuses on pile driving activities and was carried out to demonstrate that forced acceleration of pre-installed equipment, caused by transmission of pile driving energy to the towhead, did not exceed the equipment's recommended allowable shock limits. The desired outcome of the analyses was an understanding that equipment pre-installation offered an acceptable design solution for a particular towhead configuration founded on a soft silty clay soil in the North Sea and that this outcome would be applicable to future similar towheads.
机译:管道束在拖曳头歧管结构之间牵引到现场,该结构设计用于包含所有歧管阀 - 工作和控制设备。拖曳头是空间框架,其不仅在服务期间支持和保护车载设备,而且还允许在安装期间附着牵引和受控的压载操作所需的临时浮力单元。牵引式空间框架内的预安装设备必须在捆绑的捆绑运输,发射,海上拖曳和桩驾驶操作后可操作,以为海底保护一些拖头。该分析报告的工作在本文的重点打桩活动,并进行了演示预安装的设备是强制加速,造成打桩能量到沙洲的传输,不超过设备的建议允许冲击极限。分析的预期结果是了解,设备预安装为特定的牵引头配置提供了可接受的设计解决方案,该牵引杆配置在北海的软粉状土壤上成立,这一结果适用于未来类似的拖头。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号