首页> 外文会议>Stormwater and green infrastructure symposium >Delivering Performance-Based Partnerships by Leveraging Private Investment and Accountability to Unlock Public Capital at Scale
【24h】

Delivering Performance-Based Partnerships by Leveraging Private Investment and Accountability to Unlock Public Capital at Scale

机译:通过利用私人投资和问责制可在规模上解锁公钥来提供基于绩效的伙伴关系

获取原文

摘要

Stormwater is a growing, unfunded mandate and environmental challenge, which has become a burden on local government's budgets, and impedes local development and overall economic growth in communities nationwide. To partially offset the unfunded mandate several programs have been created that offer subsidized financing below the costs of municipal general obligation bonds. However, these subsidized funding programs can have rigorous application requirements that require significant resources and time; have restrictions on the scopes and uses of the money that limit broader public co-benefits; and require the applicant to have already invested significant dollars to confirm feasibility, obtain permitting, and determine pricing surety. These requirements on municipalities and public water authorities create barriers for them to access this subsidized capital at a scale large enough to make significant progress towards achieving regulatory compliance. Alternatively, traditional long-term private financing options available for infrastructure programs can be costly and make public officials hesitant to make such a large revenue commitment in advance of the work being completed.
机译:雨水是一个日益增长,不统一的任务和环境挑战,这已成为地方政府预算的负担,并阻碍了全国社区的当地发展和整体经济增长。为了部分抵消未抵消的任务,已经创建了一些计划,这些计划提供低于市一般义务债券的费用的补贴融资。但是,这些补贴资金计划可以具有需要大量资源和时间的严格申请要求;限制了限制更广泛的公共共济福利的金钱的范围和用途;并要求申请人已经投入了大量的美元以确认可行性,获得许可,并确定定价担保。这些关于市政当局和公共水当局的要求为他们创造了以足够大的规模访问此补贴资本的障碍,以实现达到法规遵从性的重大进展。或者,可用于基础设施计划的传统长期私人融资选择可能是昂贵的,并使公职人员犹豫不决,在完成的工作之前提前提出如此大的收入承诺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号