首页> 外文会议>Geohunan international conference >Mechanism Analysis and Treatment of Landslide of Changtan New River
【24h】

Mechanism Analysis and Treatment of Landslide of Changtan New River

机译:长潭新河滑坡机制分析与处理

获取原文

摘要

Due to the continual rainfall and creep deformation occurring to the slope on left bank of the new river in the flood control projects in Liye west of Hunan, and a serious landslide was likely to occur to the slope. Based on the analysis of the mechanism of landslide and slope stability, and the stratum layer parameter inversion carried by the Least Square method, we finally decided to use pre-stressed cable and anchor for the treatment to the slope. The monitoring result indicated that this treatment plan is reliable and safe.
机译:由于湖南省李耶河口河流左岸左岸的坡度持续的降雨量和蠕变变形,坡度可能会发生严重的滑坡。基于对滑坡和边坡稳定性机理的分析,以及由最小二乘法携带的层层参数反演,我们最终决定使用预应力的电缆和锚来处理斜坡。监测结果表明,该处理计划可靠且安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号