首页> 外文会议>SPE/ICoTA Coiled Tubing Well Intervention Conference Exhibition >Enabling Workover Applications With Coiled-Tubing-Deployed Inflatable Packers
【24h】

Enabling Workover Applications With Coiled-Tubing-Deployed Inflatable Packers

机译:通过卷绕管部署的充气封装器启用用于器件应用

获取原文

摘要

Cantarell field produces a significant portion of the total oil production of PEMEX. Over the past few years, Cantarell oil production has been declining, mainly because of the maturity of the field. Sustaining oil production at current levels is a constant challenge for PEMEX, which is also attempting to increase exploration. One of the main challenges involves an increase in water production, which has led to wells being temporarily shut in until a workover rig becomes available. This waiting time could be years. Meanwhile, PEMEX is investigating alternative solutions to optimize rig utilization and offshore rigless workover options. Recently, coiled-tubing-conveyed inflatable packers have become a key enabler when performing workover operations while the production tubing remains in place, which enhances timely and cost-effective intervention solutions. Throughtubing inflatable packers have successfully isolated zones during water-control treatments, cementing operations through coiled tubing (CT), and permanent zonal abandonment, thus enabling the operator to perforate the upper oil-bearing zones. The use of through-tubing inflatable packers for zonal isolation is now featured in the rigless workover plan for several wells, which is expected to deliver a significant increase in oil production. This paper examines these recent applications of throughtubing inflatable packers in the region and presents the relevant well conditions and the criteria used for selection. It provides case histories and best practices from several through-tubing applications. Recommendations for job design, auxiliary equipment, and personnel competency are thoroughly discussed.
机译:Cantarell Field生产Pemex总石油总产量的重要部分。在过去的几年里,Cantarell石油产量一直在下降,主要是因为该领域的成熟度。持续水平的石油产量是PEMEX的持续挑战,这也试图增加勘探。其中一个主要挑战涉及水资源的增加,这导致井暂时关闭,直到工作台可用。这位等待时间可能是年份。同时,PEMEX正在调查替代解决方案,以优化钻机利用和离岸严格的下班选项。最近,当生产管仍然存在时,盘管输送的充气封装器已成为关键推动器,当生产管仍然存在时,它增强了及时和经济高效的干预解决方案。贯穿在水控制处理过程中,通过螺旋管(CT)和永久性地遗弃,通过螺栓处理操作,通过螺杆膨胀的封装器成功隔离区块,从而使操作员能够穿孔上含油区。对于几个井的无Rigless工作装置计划,现在采用了用于区域隔离的通汽充气封装器的使用,这有几个孔预计将能够显着增加石油生产。本文介绍了该地区吞吐量充气封装的最新应用,并提出了相关的井条件和用于选择的标准。它提供了来自多个通风应用的案例历史和最佳实践。彻底讨论了就业设计,辅助设备和人员能力的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号