首页> 外文会议>International conference on construction real estate management >Risk Factors Analysis in Whole Life-Cycle Cost of Civil Infrastructure
【24h】

Risk Factors Analysis in Whole Life-Cycle Cost of Civil Infrastructure

机译:民事基础设施整个生命周期成本的危险因素分析

获取原文

摘要

Civil infrastructure has the features of large-scale investment, long construction and payback term. Risks and loss will be caused by errors in any link. It抯 essential for the sponsors to find a solution that cut the whole life-cycle (WLL) cost to the lowest. This paper aims to explore the risk factors that affect the cost of civil infrastructure in whole life-cycle. The WLL can be divided into three phases: design, construction, operation and maintenance. First, structure of cost in every phase are analyzed; Second, risk factors that affect the WLL cost of civil infrastructure in every phase can be identified; Third, it will compare road/bridge project with dam and water treatment plant projects; Finally, suggestions on risk control are given based on the risk identification.
机译:民事基础设施具有大规模投资,长期建设和回收术语的特点。任何链接中的错误都会引起风险和损失。它为赞助商找到一个解决方案,将整个生命周期(WLL)成本降至最低。本文旨在探讨影响整个生命周期内基础设施成本的危险因素。 WLL可分为三个阶段:设计,施工,操作和维护。首先,分析每个阶段的成本结构;其次,可以识别影响每个阶段在每个阶段的WLL成本的危险因素;第三,它将与大坝和水处理厂项目进行比较道路/桥梁项目;最后,基于风险识别给出了对风险控制的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号