首页> 外文会议>SPE/DOE Improved Oil Recovery Symposium >Injector-Well Completion Designs for Selectively Waterflooding Up to 18 Zones in a Multilayered Reservoir: Experiences in the Cerro Dragon Field
【24h】

Injector-Well Completion Designs for Selectively Waterflooding Up to 18 Zones in a Multilayered Reservoir: Experiences in the Cerro Dragon Field

机译:注射器井完成设计,用于在多层水库中选择性地喷洒18个区域:塞罗龙领域的经验

获取原文

摘要

The Cerro Dragon asset, located in the highly mature area of Golfo San Jorge Basin, Argentina, has around 30 producing structures; each one containing from 20 to 50 separate, highly heterogeneous, reservoir horizons, from 6 to 30 feet thick. From 1999 to 2005 proved reserves increased threefold and non proved reserves increased fourfold, moreover, oil production grew from 48,000 BOEPD to over 116,000 BOEPD, largely due to optimization and expansion of waterflood projects. The aim of these projects was to increase the water injection rate from 248,000 BWPD to 714,000 BWPD along with the 1999 average of 5 reservoirs accessed per injector-well to an average of 12, with a maximum of 25, in 2005, keeping at the same time the highest possible control over the injected-water flow rate on each layer. In an experimental process started in 2000, injector-well completions were designed and tested in several wells with different reservoir properties. The experience acquired with the analysis of these completions was used to improve them as well as to develop new ones. Today, this process continues, testing and enhancing new designs to fulfill the needs of the upcoming waterflooding projects. This paper shows the experience acquired from 401 injector- well completions over the past 6 years, discuss the successes and problems encountered with each completion design under different reservoir conditions (i.e. differential pressures between layers). In addition, it contains information about the procedures and technology used to reduce the completion set up cost and to extend its useful life by solving leakage problems without replacing the completion installation. The mayor achievement at this point of the process have been successfully running an injector-well completion of a total of 19 packers and 18 injector mandrels (with an average of 12 packers and 12 mandrels out of 48 completions ran on the first half of 2005). The objective of this paper is to serve as a reference guide for injector-well completion designs in multilayered fields where a vertical expansion of the waterflooding projects is intended.
机译:Cerro Dragon Asset位于阿根廷高尔夫乔治盆地的高度成熟地区,拥有大约30个生产结构;每个人含有20至50个单独的,高度异质的,储层视野,厚度为6至30英尺。从1999年到2005年,据证明储备增加了三倍,未探明的储量增加了四倍,而且石油产量从48,000升至超过116,000多台Bopd,主要是由于水运项目的优化和扩张。这些项目的目的是从248,000 BWPD增加水喷射速率,以714000 BWPD与1999年平均5个储层的每个喷射孔存取以平均12的沿,具有最多25个,在2005年,保持在相同的在每层上对注射水流速的最高可能控制。在2000年开始的实验过程中,在具有不同储层性质的几个孔中设计并测试了注射器井完成。通过分析这些完成的经验用于改进它们以及开发新的经验。如今,这一过程继续,测试和增强新设计,以满足即将到来的水上飞机项目的需求。本文显示了在过去6年中获得的401个注射器 - 完井的经验,讨论了不同储层条件下的每个完井设计所遇到的成功和问题(即层之间的差分压力)。此外,它还包含有关用于减少完成设置成本的程序和技术的信息,并通过解决泄漏问题而不替换完成安装来扩展其使用寿命。在该过程的这一点上的市长成就已经成功地运行了一系列的注射器 - 完整的总共19个封隔器和18个注射器心轴(平均12个包装器和12个封装机和12个心轴在48个完井中跑到2005年上半年) 。本文的目的是用作在多层领域的喷射器井完成设计的参考指南,其中旨在的垂直膨胀项目的垂直膨胀。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号