首页> 外文会议>World energy engineering congress >TURNING VISION INTO REALITY LEVERAGING TECHNOLOGY AND CUTURE TO REALIZE ENERGY SAVINGS AT A LARGE PUBLIC UTILITY
【24h】

TURNING VISION INTO REALITY LEVERAGING TECHNOLOGY AND CUTURE TO REALIZE ENERGY SAVINGS AT A LARGE PUBLIC UTILITY

机译:将愿景转变为现实,利用技术和文化实现大型公用事业的节能

获取原文
获取外文期刊封面目录资料

摘要

Today's operating pressures faced by utilities include both an increased focus on fiscal responsibility and cost reductions, combined with a higher and ever increasing level of environmental quality standards. This puts a brighter spotlight and greater pressure toward improving their operational efficiencies that continue to drive utilities to optimize performance and operation of their facilities. This not only saves energy, but makes them more environmentally sustainable. An energy audit is a process typically used to evaluate a system for such efficiencies and energy savings. When energy audits are performed for water and wastewater utilities, not only can electrical energy savings be realized, but savings in other resources such as process chemical use or parasitic water losses may also realized. An energy audit and savings plan being conducted for DC Water at their Blue Plains Advanced WWTP and DC Water's associated water, wastewater and stormwater pumping stations provides a case study on how these audits should be conducted for maximum effectiveness and to identify a path forward toward realizing resultant energy savings and carbon footprint reductions. Specific focus areas will include: 1. Evaluation of treatment process configuration and operation, followed by an analysis of modifications or capital additions that can be made to reduce energy consumption. This also includes an analysis of building envelopes, HVAC systems, lighting, general rotating equipment and electrical distribution systems. 2. A review of current energy use, patterns of use, and opportunities to conserve, including development of an energy baseline and benchmarking. 3. Alternative energy evaluation covering the areas of biosolids, solar, wind, and small hydro; including both onsite production and procurement from third parties. Development of an implementable, prioritized energy management plan is critical. This includes identifying "quick wins" or low- to no-cost measures that can be implemented in the short-term, with little initial capital investment, resulting in almost immediate decrease in the energy consumption. The process continues with identification of opportunities that are more capital intensive, but still with reasonable payback periods, that are more time consuming to implement. In addition, a successful program must go beyond implementation of audit results, and include monitoring and verification, as well as continuous improvement practices. When conducted properly, our experience demonstrates that the payback period on these audits is such that the cost of the audit alone can be recovered in less than two years by implementing certain recommendations. The actual payback period on the recommended opportunities is also very short. Finally, the technical side of an energy management plan is only half of the equation. The other half is the culture change required at all levels in the organization to implement the results of the plan, both initially and more importantly, in a sustainable fashion. Organizational change management starts with a compelling vision from the top of the organization, and understanding of the significance and potential benefits of the change at all levels. Regular communication is essential, once the vision is set. A process for feedback from the organization, and demonstrating that the organization is engaging input from its employees is also important.
机译:今天,公用事业面临的经营压力包括增加对财政责任和成本减少的焦点,与环境质量标准的较高和不断增加的水平相结合。这使得更明亮的聚光灯和更大的压力来提高他们继续推动公用事业的运营效率,以优化其设施的性能和运营。这不仅可以节省能源,而且使它们更加环保。能源审计是通常用于评估系统以获得此类效率和节能的过程。当为水和废水公用设施进行能量审计时,不仅可以实现电能节省,而且还可以实现诸如过程化学用途或寄生水损失的其他资源中的节省。在其蓝色平原先进的WWTP和DC水的DC水中进行的能源审计和储蓄计划进行了直流水,废水和雨水泵站为如何进行最大效力,并确定对实现的路径进行案例研究结果节能和碳足迹减少。具体的焦点区域将包括:1。对处理过程配置和操作的评估,然后分析可以使能耗降低能耗的修改或资本添加。这还包括建筑包络,HVAC系统,照明,一般旋转设备和配电系统的分析。 2.对当前能源使用,使用模式和保护的机会审查,包括开发能源基线和基准。 3.覆盖生物糖,太阳能,风和小水压区域的替代能源评估;包括来自第三方的现场生产和采购。制定可实现的,优先的能源管理计划至关重要。这包括识别“快速获胜”或低于不成本措施,可以在短期内实施,初始资本投资很少,导致能源消耗几乎立即降低。该过程继续识别资本密集型的​​机会,但仍有合理的投资回收期,这更耗时。此外,成功的计划必须超越审计结果的实施,并包括监测和验证,以及持续改进做法。正确进行时,我们的经验表明,这些审计的投资回收期是通过实施某些建议,可以在不到两年的时间内收回审计的成本。建议机会的实际投资回收期也很短。最后,能源管理计划的技术方面仅为方程的一半。另一半是本组织各级所需的文化变革,以便以可持续的方式实施计划的结果,最初,更重要的是。组织变革管理从组织顶部的令人信服的愿景开始,以及了解各级变革的重要性和潜在利益。一旦愿景,常规沟通至关重要。从事组织的反馈过程,并证明本组织从员工中参与意见也很重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号