首页> 外文会议>Annual International Pittsburgh Coal Conference >Development of China's Coal Mining Technology and Equipment
【24h】

Development of China's Coal Mining Technology and Equipment

机译:中国煤炭矿业技术与设备的发展

获取原文

摘要

Strategic position of coal in China and three development stages of long wall mining technology and equipment, together with the last ten years important development achievements of mining technology and equipment were discussed. It introduces the main technology innovations, technical characteristics and application effects of some important projects in the field, such as the completed technology and equipment for 6 million tons in one long wall face, the key technique and equipment of long wall face for 35° ~55° inclined seam, the completed technology and equipment for 10 million tons in high cutting long wall face, the top coal caving long wall mining technology and equipment for 20 meters coal seam. At last, it presents the development directions and prospects of China's coal mining technology and equipment.
机译:中国煤炭战略地位和长城矿业技术和设备的三个发展阶段,讨论了矿业技术和设备的最近十年的重要发展成果。 它介绍了该领域一些重要项目的主要技术创新,技术特点和应用效果,如在一个长壁面中完成的技术和设备,长壁面600万吨,长壁面的关键技术和设备35°〜 55°倾斜接缝,完成的技术和设备在高切割长壁面上1000万吨,顶部煤炭扑式长壁挖掘技术和设备20米煤层。 最后,它提出了中国煤矿技术和设备的发展方向和前景。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号