Risk assessment and management during the implementation process of a small scale hydropower plants

机译:小规模水电站实施过程中的风险评估与管理

获取原文

摘要

The paper analyzes the risk both during prefeasibility study and construction of a small scale hydropower plant (SHPP). The water discharge of the turbine is 0.550 m3/s with net head 143 meters and power output 680 kW. The performed probability analysis (P50) shows that probability of the annual discharge of the power plant at the point of water catchment amounted to 0.512 m3/s as P90 annual water discharge is 0.260 m3/s. The uncertainty model in terms of estimation of the electricity production was adopted. The accepted deviation is ± 15 % in relation with hydrological data, -10% because of operational stops, ± 5 % because of facility managements and -2 % of water intake management. Five risks were identified as probabilities and consequences were presented. Additional recommendations for risk management were made. Risk matrix for the significant risks severe consequences were presented.
机译:本文分析了前义的研究和建设小规模水电厂(SHPP)的风险。涡轮机的排水为0.550米 3 / s带净头143米,电源输出680 kW。所表现的概率分析(P50)表明,水集水区的电厂年排放的可能性达0.512米 3 / s作为P90年度排水量为0.260米 3 / s。采用了电力生产估计的不确定性模型。接受的偏差与水文数据相关,-10%,由于运营停止,由于设施管理和-2%的水进口管理,±5%。将五种风险被确定为概率,并提出后果。制定了额外的风险管理建议。风险矩阵对于显着风险的严重后果呈现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号