首页> 外文会议>International Power Electronics Conference >The research on reliability and real-time of the scheme of process layer GOOSE network in smart substation based on artificial cobweb topology structure
【24h】

The research on reliability and real-time of the scheme of process layer GOOSE network in smart substation based on artificial cobweb topology structure

机译:基于人工蜘蛛网拓扑结构的智能变电站工艺层鹅网方案的可靠性和实时研究

获取原文

摘要

According to GOOSE defined in the IEC61850 in the smart substation, it explicitly stipulates the requirements for the transmission in reliability and real-time of the process layer network scheme. The cobweb structure is an artificial communication network topology based on cobweb as it occurs in nature. On the basis of the cobweb in the nature, a novel cobweb topology structure, based on process layer GOOSE network in smart substation is proposed in this paper. With the method of fault tree analysis, this paper demonstrates the reliability of the network scheme in one certain smart substation. Industrial Ethernet transmission analysis on delay and OPNET Modeler are also employed to proof the cobweb topology performs well in reliability and real-time. The results of the theoretical analysis and simulation indicate that the cobweb topology structure exhibits excellent reliability and realtime in smart substation GOOSE communication network.
机译:根据IEC61850中的鹅在智能变电站中定义,它明确规定了在过程层网络方案的可靠性和实时传输的要求。蜘蛛网结构是基于蜘蛛网的人工通信网络拓扑,因为它在自然界中发生。在本文的基础上,基于智能变电站中的基于过程层鹅网络的新型蜘蛛网拓扑结构。通过故障树分析方法,本文展示了一个特定智能变电站中网络方案的可靠性。延迟和OPNET建模器的工业以太网传输分析也用于证明COBWEB拓扑在可靠性和实时执行。理论分析和仿真的结果表明蜘蛛网拓扑结构在智能变电站鹅通信网络中表现出优异的可靠性和实时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号