首页> 外文会议>International Conference on Computer, Control, Electrical, and Electronics Engineering >The effect of Test-Driven Development and Behavior-Driven Development on Project Success Factors: A Systematic Literature Review Based Study
【24h】

The effect of Test-Driven Development and Behavior-Driven Development on Project Success Factors: A Systematic Literature Review Based Study

机译:试验驱动和行为驱动发展对项目成功因素的影响:基于系统的文献综述研究

获取原文

摘要

Agile testing approaches test-driven development (TDD), behavior-driven development (BDD); have gained popularity since the introduction of agile practices. The concept of using these approaches in software projects is to help projects succeed. The effect of TDD and BDD on Project success factors namely, cost, time, and customer satisfaction/external quality, remains an area of investigation. Therefore, this study investigates the results of previously published articles on the effect of TDD and BDD on project success factors. A systematic literature review has been conducted considering articles published between 1999 up to 2020. Thirty-one studies were selected and analyzed. 74.1% of studies are experiments, 25.8% are case studies. 67.7% of these studies were performed in an industrial setting, 29.0% were performed in an academic setting and only one study with 3.22% was mixed academic and industrial settings. The result shows that the TDD and the BDD consume more time and cost compared to traditional testing (TLD). Moreover, the TDD as TLD may not necessarily satisfy the customer unlike the BDD appears that achieve customer satisfaction. Although, when TDD compared to BDD, TDD consumed more time and lower customer acceptance than the BDD.
机译:敏捷测试方法测试驱动的开发(TDD),行为驱动的开发(BDD);自敏捷实践引入以来,越来越受欢迎。在软件项目中使用这些方法的概念是帮助项目成功。 TDD和BDD对项目成功因素的影响即,成本,时间和客户满意度/外部质量仍然是调查领域。因此,本研究调查了先前公布的文章的结果,就TDD和BDD对项目成功因素的影响。考虑到1999年至2020年间公布的文章进行了系统文献综述。选择并分析了三十一项研究。 74.1%的研究是实验,25.8%是案例研究。这些研究的67.7%在工业环境中进行,29.0%在学术环境中进行,只有一项三项研究,3.22%是混合学术和工业环境。结果表明,与传统测试(TLD)相比,TDD和BDD消耗更多的时间和成本。此外,作为TLD的TDD可能不一定满足客户与实现客户满意度的BDD不同的客户。虽然,当TDD与BDD相比,TDD消耗更多的时间并降低客户接受而不是BDD。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号