Lessons Learned During Rehabilitation of the North Mimico STS and South Mimico STS, Toronto, Canada

机译:在加拿大多伦多北部米莫科斯和南部咪科斯康复康复期间汲取的经验教训

获取原文

摘要

After completing an assessment of the City of Toronto's sanitary trunk sewer (STS) network, rehabilitation of several sewers were identified as requiring various degrees of repair. Rehabilitation of North Mimico STS and South Mimico STS was recommended and completed in 2017/2018. Rehabilitation of these sewers within the environmentally sensitive Mimico Creek floodplain proved challenging during design and in construction, including working within a golf course, several creek crossings, temporary bypass, and structural rehabilitation of MHs. This project was especially challenging as the work, which included rehabilitation of over 1 km of STS ranging from 675 mm to 1350 mm diameter, bypass, access routes and restoration, was required to be completed within 5 months, over the winter.
机译:在完成多伦多市卫生干线下水道(STS)网络的评估后,将几个下水道的康复被确定为需要各种修复程度。建议并在2017/2018年建议并完成了北方Mimico STS和South Mimico STS的康复。在环境敏感的Mimico Creek洪泛区内的这些下水道的康复证明了设计和建设中的具有挑战性,包括在高尔夫球场,几个小溪交叉口,临时旁路和MHS的结构康复工​​作。该项目特别具有挑战性,包括在575毫米至1350毫米至1350毫米的康复中,在5个月内,彻底,通行路线和恢复,恢复了超过675毫米的STS的康复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号