King County's West Point Treatment Plant A 90-Day Recovery to NPDES Permit Compliance Following Catastrophic Flooding and Plant Shutdown Due to Effluent Pump Station and Equipment Failures

机译:King County的West Point治疗厂为期90天恢复到NPDES允许遵守灾难性洪水和植物关机因污水泵站和设备故障而遵守

获取原文

摘要

The West Point Treatment Plant (WPTP) in Seattle, WA is part of the King County Wastewater Treatment Division (WTD) and is the largest wastewater treatment plant treating domestic, commercial, and industrial wastewater and significant combined sewer flows in the greater Seattle area. The WPTP has a rated capacity of 215 MGD under maximum month condition and 440 MGD at peak. It uses a high purity oxygen activated sludge process followed by chlorine disinfection before discharging the treated effluent to central Puget Sound. After the original construction in 1965 as a primary treatment plant, the plant was expanded in 1996 to include secondary treatment for flows up to 300 MGD. Through the use of three pump stations and two flow diversion/control structures, influent flows in excess of 300 MGD receive only primary treatment. The plant hydraulic profile is presented in Figure 1. The three pump stations are driven by electric motors or gas engines and thus respond differently to power failures. On February 9, 2017, the WPTP suffered a power failure and subsequent effluent pumping and control system failures, which led to the flooding of a mile of subterranean pipe and equipment galleries with stormwater, raw sewage, and sludge. The flooding contaminated, damaged or destroyed millions of dollars of plant equipment including pumps, motors, boilers, electrical panels, wiring, transformers, lighting, switches, and motor control centers. The flood contaminated the entire surface area of the galleries, over two miles of pipe insulation, and destroyed WTD staff locker/shower facilities leading to a complete shutdown of the WPTP. WTS staff responded immediately to initiate emergency response efforts and within 18 hours returned the plant to half of its hydraulic capacity including limited treatment with screenings, partial primary treatment, and final effluent disinfection and dechlorination. Over the following 75 days, a joint effort from up to 46 WTD staff and 115 contract personnel performed the required refurbishments and replacements of critical plant equipment to allow for the full startup of all hydraulic processes damaged by the flood. Following the equipment repair and replacement effort, coordinated efforts were made by the WTD staff and process experts from the consulting industry and academia to achieve full capacity for both the secondary treatment and solids digestion and handling as quickly as possible. These combined efforts led to success in the WPTP achieving 100% NPDES permit compliance within 90 days of the event with fully functioning equipment, secondary treatment and solids digestion. Recovery efforts continued for another six months concluding with the full recovery of the digesters, the commissioning of three fully refurbished boilers, installation of new motor control centers (MCCs), and return to permanent power.
机译:西雅图的西点治疗厂(WPTP)是国王县污水处理部(WTD)的一部分,是最大的废水处理厂,处理国内,商业和工业废水和大型西雅图地区的重要组合下水道流动。 WPTP在最大月份条件下具有215 MgD的额定容量,峰值为440 mgD。它采用高纯度氧活化污泥处理,然后进行氯消毒,然后将处理过的流出物放入中央贵宾声音。在1965年的原始施工作为主要治疗厂之后,该植物于1996年扩大,包括高达300 MgD的流动的二次处理。通过使用三个泵站和两个流动分流/控制结构,流入流量超过300 MGD仅接受初级处理。植物液压轮廓如图1所示。三个泵站由电动机或气体发动机驱动,从而响应不同的电力故障。 2017年2月9日,WPTP遭遇了动力故障和随后的污水泵送和控制系统故障,导致了一英里的地下管道和设备画廊,具有雨水,原始污水和污泥。洪水污染,损坏或摧毁了数百万美元的植物设备,包括泵,电机,锅炉,电气面板,布线,变压器,照明,开关和电机控制中心。洪水污染了一系列画廊的整个表面积,超过两英里的管道绝缘,并摧毁了WTD员工储物柜/淋浴设施,通往WPTP的完全关机。 WTS工作人员立即回复,以启动应急响应努力,在18小时内将工厂恢复到其液压能力的一半,包括有限的筛选治疗,部分初级治疗和最终出水消毒和脱氯。在以下75天内,从最多46项WTD工作人员和115名合同人员提供了一项联合努力,为关键工厂设备进行了所需的翻新和更换,以便全面启动洪水损坏的所有液压过程。在设备维修和更换努力之后,WTD员工和工艺专家从咨询行业和学术界进行协调努力,以实现次要治疗和固体消化和尽可能快地处理的全部能力。这些综合努力导致WPTP成功实现了100%NPDES许可遵守,在事件的90天内,具有完全运作的设备,二次治疗和固体消化。恢复努力持续六个月的六个月结束,全面恢复了消化器,调试三个全新的锅炉,安装新的电机控制中心(MCC),并返回永久性。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号