首页> 外文会议>Simulation Conference >A Mixed-Integer Formulation to Optimize the Resupply of Components for the Installation of Offshore Wind Farms
【24h】

A Mixed-Integer Formulation to Optimize the Resupply of Components for the Installation of Offshore Wind Farms

机译:混合整数配方,以优化用于安装海上风电场的组件的补充

获取原文

摘要

Over the last decade, offshore wind energy has become a viable source of sustainable energy. During the installation of offshore wind farms, the dimensioning of related base ports became increasingly important. Base ports act as central logistics hubs for the installation and, thus, need to provide sufficient space and equipment to store and handle required components. Thereby, current developments tend to larger and heavier components as well as to an increase in simultaneously occurring installation and decommissioning projects. This article proposes a Mixed-Integer formulation for the optimization of supply deliveries to the base port. Moreover, it presents an example of this formulation’s integration with an optimization of the base port capacity and, furthermore, a simulation study on the effects of different resupply cycles on the efficiency of installation projects. Results show that the resupply cycle has a minor influence on the project’s efficiency but highly affects the base port capacity.
机译:在过去十年中,海上风能已成为可持续能源的可行源。在安装海上风电场期间,相关基地港口的尺寸变得越来越重要。基端口充当用于安装的中央物流集线器,因此需要提供足够的空间和设备来存储和处理所需的组件。由此,目前的发展趋于较大,更重的成分以及同时发生的安装和退役项目的增加。本文提出了混合整数配方,以优化供应交付到基端口。此外,它提出了该制剂的集成的一个例子,以及优化基础端口容量,而且,对不同再补给周期对安装项目效率的影响的仿真研究。结果表明,再补给周期对项目的效率有次要影响,但高度影响了基础港口能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号