首页> 外文会议>International Seminar on Application for Technology of Information and Communication >Time and Cost Optimization Using Dynamic Programming and FMS Scheduling
【24h】

Time and Cost Optimization Using Dynamic Programming and FMS Scheduling

机译:使用动态编程和FMS调度的时间和成本优化

获取原文

摘要

Quality of information system at a company in Surabaya which is engaged in buying and selling wireless devices greatly affect the business performance of the company. One of the processes that support the running of this company is the process of Return Material Automatically (RMA). In this study, a RMA model business processes used by the authors for optimizing time and costs. To generate an alternative direction, the author uses an scheduling algorithm referred to Flexible Manufacturing System (FMS). After a time the optimal alternative route is obtained, it become input of programming objectives that will be calculated with Dynamic Programming, then the best route will be obtained using the optimal time and cost. The results of this study indicate that FMS Scheduling can be used to optimize time, and Dynamic Programming can be used to optimize the cost of this research. The results show that Trace 2 provides the optimal results compared to Trace 1.
机译:从事购买和销售无线设备的泗水信息系统的信息系统质量极大地影响了公司的业务绩效。支持该公司运行的流程之一是自动退回材料的过程(RMA)。在本研究中,作者使用的RMA模型业务流程优化时间和成本。为了生成替代方向,作者使用柔性制造系统(FMS)的调度算法。在获得最佳替代路由之后,它成为将通过动态编程计算的编程目标的输入,然后使用最佳时间和成本获得最佳路线。该研究的结果表明,FMS调度可用于优化时间,动态编程可用于优化该研究的成本。结果表明,与痕量1相比,痕迹2提供了最佳结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号