首页> 外文会议>Conference on Ground-based and Airborne Instrumentation for Astronomy >FORS-Up: Making the most versatile instrument in Paranal ready for 15 more years of operations
【24h】

FORS-Up: Making the most versatile instrument in Paranal ready for 15 more years of operations

机译:Fors-up:在帕拉尔制造最通用的仪器准备好了15年的运营

获取原文

摘要

The FORS Upgrade project (FORS-Up) aims at bringing a new life to the highly demanded workhorse instrument attached to ESO's Very Large Telescope (VLT). FORS2 is a multimode optical instrument, which started regular science operations in 2000 and since then, together with its twin, FORS1, has been one of the most demanded and most productive instruments of the VLT. In order to ensure that a FORS shall remain operational for at least another 15 years, an upgrade has been planned. This is required as FORS2 is using technology and software that is now obsolete and cannot be put and maintained to the standards in use at the Observatory. The project - carried out as a collaboration between ESO and INAF-Astronomical Observatory of Trieste- aims at bringing to the telescope in 2023/2024 a refurbished instrument with a new scientific detector, an upgrade of the instrument control software and electronics, a new calibration unit, as well as additional filters and grisms. The new FORS will also serve as a test bench for the Extremely Large Telescope (ELT) standard technologies (among them the use of programmable logic controllers and of the features of the ELT Control Software). The project aims at minimising the downtime of the instrument by performing the upgrade on the currently decommissioned instrument FORS1 and retrofitting the Mask Exchange Unit and polarisation optics from FORS2 to FORS1.
机译:FORS升级项目(BOSS-UP)旨在为eSO非常大望远镜(VLT)的高度要求的工作乐器带来新的生命。 Fors2是一款多模光学仪器,该仪器于2000年开始定期科学业务,从那以后,与其双胞胎,FORS1一起是VLT最具要求和最富有成效的仪器之一。为了确保措施至少持续15年来保持运营,计划升级。这是必需的,因为Fors2正在使用现在已经过时的技术和软件,无法将和维护在天文台使用的标准。该项目 - 作为ASO和INAF-天文天文学的合作,其旨在在2023/2024在经过翻新的仪器中带来望远镜,具有新的科学探测器,仪器控制软件和电子设备的升级,新校准单位,以及额外的过滤器和生长。新的fors还将作为极大的望远镜(elt)标准技术的测试台(其中包括可编程逻辑控制器和ELT控制软件的功能)。该项目旨在通过在当前退役的仪器FORS1上执行升级并将掩模交换单元和从Fors2的极化光学改造到FORS1来最大限度地减少仪器的停机时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号