【24h】

Is Our Emergency Action Plan Time Sensitive?

机译:我们的紧急行动计划时间敏感吗?

获取原文

摘要

The Federal Energy Regulatory Commission (FERC) implemented a Time Sensitive Initiative in 2009 to ensure Emergency Action Plans (EAP) for FERC Projects are effective and the response times are minimized during a dam failure. Dam owners are required to perform a sudden failure assessment to determine if the duration of the response time makes their EAP time sensitive, i.e. insufficient time for warnings to reach people before they are impacted by flooding. If it is, then additional measures to reduce response times must be evaluated to make the EAP more effective. In 2019, East Bay Municipal Utility District (EBMUD) performed a sudden failure assessment in collaboration with local emergency management agencies potentially affected by a failure of two of EBMUD's FERC jurisdictional dams on the western slope of the California Sierra Nevada foothills. An overview of the process and results are discussed as well as the next steps to reduce response times.
机译:联邦能源监管委员会(FERC)在2009年实施了一项时间敏感倡议,以确保FERC项目的紧急行动计划(EAP)是有效的,并且在坝故障期间最小化响应时间最小化。 大坝业主需要进行突发的失败评估,以确定响应时间的持续时间是否使其EAP时间敏感,即警告在受洪水影响之前的警告时间不足。 如果是,则必须评估减少响应时间的额外措施,以使EAP更有效。 2019年,东湾市政公用事业区(EBMUD)与当地应急管理机构进行突发的失败评估,可能受到艾博尔德·内华达山麓西部坡上的两家ebmud司法管辖区失败的影响。 讨论了过程和结果的概述以及减少响应时间的下一步。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号