Physical Model Study of the Proposed Low Froude Number Stilling Basin at Cedar Falls Hydroelectric Project

机译:雪松水电项目拟议低弗劳德数盆地的物理模型研究

获取原文

摘要

The Cedar Falls Hydro Generating Station is owned and operated by Xcel Energy on the Red Cedar River. The mostly-hollow Ambursen dam was constructed in 1910 and is about 60 feet tall. The project is incapable of passing the current inflow design flood (IDF) prior to overtopping. After an initial study to compare remediation options, the spillway was redesigned with six large tainter gates on an ogee spillway and a smaller crest gate to pass debris and lower return period flows. The uncommon alternative low Froude number stilling basin described by the United States Bureau of Reclamation was chosen to contain the hydraulic jump and dissipate energy for flows through the modified spillway. The St. Anthony Falls Laboratory at the University of Minnesota constructed a 1∶36 scale physical model of the entire structure including the proposed spillway replacement and low Froude number stilling basin to validate the stilling basin.
机译:雪松瀑布水电发电站由红雪松河上的Xcel Energy拥有和操作。 大多数空心的amborsen大坝建于1910年,大约60英尺高。 该项目无法在过度运行之前传递当前的流入设计泛滥(IDF)。 在比较修复方案的初步研究之后,溢洪道在ogee溢洪道和较小的嵴门上重新设计了六个大型陶器门,以通过碎片和较低的返回周期流。 选择了美国填海局描述的罕见替代的低弗劳德数静脉盆地含有液压跳跃并散发通过改进的溢洪道流动的能量。 明尼苏达大学圣安东尼瀑布实验室建造了1:36规模的整个结构的物理模型,包括所提出的溢洪道更换和低弗劳德数静脉盆地,以验证静脉盆地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号