CONSTRUCTION OF THE BIG WALNUT AUGMENTATION/RICKENBACKER INTERCEPTOR TUNNEL (BWARI, PART 1) -COLUMBUS, OHIO

机译:大核桃增强/ Rickenbacker拦截器隧道(Bwari,第1部分)的建设 - 俄亥俄州

获取原文
获取外文期刊封面目录资料

摘要

The upper portion of the shaft was drilled to a diameter of 4.06 meters (5 feet 4 inches), leaving a gap of approximately 200 mm (8 inches) around the CMP casing, which was filled later with grout. After reaching the desired depth, the CMP casing was installed and grouted in place. As per the contract specifications, dewatering was not permitted in most of the sites. Thus, dry drilling was limited to few feet below the existing ground water table which in turn dictated the length of the upper casing. The top casing was also extended above ground surface to a level above the 100-year flood elevation to secure the shaft from potential flooding. This also acted as a protective ledge around the shaft for safety during construction.
机译:轴的上部钻到直径为4.06米(5英尺4英寸),围绕CMP壳体周围留下大约200毫米(8英寸)的间隙,灌浆填充。在达到所需深度后,安装CMP壳体并灌浆到位。根据合同规范,大部分地点不允许脱水。因此,干燥钻孔限制在现有地下水台下方的几英尺,其反过来决定了上壳体的长度。顶部壳体也以高于100年洪水升高的水平延伸到地面上方,以将轴免受潜在的洪水。这也充当了轴周围的保护窗口,用于在施工期间安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号