CONSTRUCTION OF THE SACRAMENTO RIVER TUNNELS ON THE LOWER NORTHWEST INTERCEPTOR SEWER, SACRAMENTO, CALIFORNIA

机译:萨克拉门托河隧道的建设在西北拦截器下水道,萨克拉门托,加利福尼亚州

获取原文

摘要

Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (EPBM). Four sheet pile shored shafts were sunk with and without dewatering. The pre-cast concrete segmentally lined and grouted tunnels were driven down at 6 percent grades beneath the river flood protection levees, buildings, roads, a railroad and adjacent to a Freeway Viaduct. Details of the schedule, cost, shaft construction, TBM, tunnel construction, and installation methodology for the twin 1.676 m (66 in) steel force main pipes and environmental constraints are provided.
机译:使用4.59米(15.1英尺)直径的地球压力平衡隧道钻孔机(EPBM),通过萨克拉门托河下方的水轴承,砂和粘土驱动了两台610米(2000英尺)的长隧道。四张堆堆脚轴沉没,没有脱水。预先铸造的混凝土分段衬里和灌浆隧道在河防洪堤坝,建筑物,道路,铁路和高速公路高架桥附近以6%的级别驱动为6%等级。提供了关于TWIN 1.676 M(66英寸)钢铁主管和环境约束的时间表,成本,轴结构,TBM,隧道结构和安装方法的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号