首页> 外文会议>Rapid Excavation and Tunneling Conference >CONSTRUCTION OF THE WEST AREA CSO TUNNELS AND PUMPING STATION
【24h】

CONSTRUCTION OF THE WEST AREA CSO TUNNELS AND PUMPING STATION

机译:西区CSO隧道和泵站的建设

获取原文

摘要

Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to control what are known as Combined Sewer Overflows (CSOs). These are events which occur when combined sewers exceed their conveyance capacity during periods of heavy rainfall or snowmelt.
机译:人口增长和越来越严格的对北美水质的监管管制导致市政府在基础设施中投资,以控制所谓的下水道溢出(CSO)。这些是当组合下水道超过其在大雨或散雪期间的运输能力超过其运输能力时发生的事件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号