首页> 外文会议>Rapid Excavation and Tunneling Conference >EVALUATING GROUND CONDITIONS AHEAD OF A TBM USING PROBE DRILL DATA
【24h】

EVALUATING GROUND CONDITIONS AHEAD OF A TBM USING PROBE DRILL DATA

机译:使用探测钻头数据评估TBM前面的地面条件

获取原文

摘要

An economic, real-time probe drill monitoring system was developed for Metropolitan Water District's Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system digitally records hydraulic feed, rotation, and percussion pressures and calculates drill advance rates during drilling. These data are computer synthesized to develop a digital representation of the ground ahead, and the resulting "picture" of the ground is distributed to the project team to assist with tunnel construction decisions (i.e., targeting grout holes, optimizing mine-cycle lengths, and avoiding becoming stuck). The analysis and interpretation procedure has now been calibrated and refined using over 5,000 m (3 miles) of geologic face mapping data.
机译:为大都市水域箭头隧道工程开发了经济,实时探测钻探监测系统,以定量评估TBM前面的基础条件。该系统在钻井期间进行数字记录液压进料,旋转和敲击压力,并计算钻头提前速率。这些数据是合成的计算机,以开发前方的地面的数字表示,并且地面的结果“图片”分布到项目团队,以协助隧道施工决策(即靶向灌浆孔,优化矿山循环长度,以及优化矿山循环长度,以及优化矿山循环长度,以及避免变得卡住)。现在已经校准了分析和解释程序,并使用了超过5,000米(3英里)的地质面映射数据来校准和精致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号