首页> 外文会议>Rapid Excavation and Tunneling Conference >CASE HISTORY OF TRENCHLESS CONSTRUCTION AT THE LOWER NORTHWEST INTERCEPTOR PROGRAM, SACRAMENTO, CALIFORNIA
【24h】

CASE HISTORY OF TRENCHLESS CONSTRUCTION AT THE LOWER NORTHWEST INTERCEPTOR PROGRAM, SACRAMENTO, CALIFORNIA

机译:南北拦截计划,萨克拉门托,加利福尼亚州的案例历史

获取原文

摘要

The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of microtunnels totaling 4,369 m (14,417 ft), three horizontal directionally drilled bores totaling 956 m (3,154 ft), and two large diameter tunnels under the Sacramento River totaling 1,198 m (3,953 ft). This paper briefly summarizes surface and subsurface conditions, and planning and design considerations. It then goes on to describe problems encounterd with each trenchless crossing, as well as lessons learned with respect to shaft construction, ground control at shafts during tunnel break-in and break-out, frac-out and heave, settlement, obstructions, coordination with permitting agencies, and application of geotechnical baseline reports.
机译:加利福尼亚州萨克拉门托最近完成的较低的西北拦截器计划(LNWI)包括10对微量箱,总计4,369米(14,417英尺),三个水平定向钻孔的钻孔,总共956米(3,154英尺),以及萨克拉门托河下的两个大直径隧道总计1,198米(3,953英尺)。本文简要概述了表面和地下条件,以及规划和设计考虑因素。然后,它继续描述与每个开关的问题相遇,以及在隧道突破和突破的轴建筑,轴的地面控制,突破,沉降,障碍物,障碍物,障碍物,协调,协调允许机构,以及岩土基线报告的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号