首页> 外文会议>Rapid Excavation and Tunneling Conference >OVERVIEW OF THE DESIGN OF THE BEACON HILL STATION AND TUNNELS
【24h】

OVERVIEW OF THE DESIGN OF THE BEACON HILL STATION AND TUNNELS

机译:灯塔山站和隧道设计概述

获取原文

摘要

Located south of downtown Seattle, the Beacon Hill Station & Tunnels is the key section of the southern segment of Sound Transit's proposed new LINK light rail system. This paper presents an overview of the design, which includes 4,300 ft of segmentally-lined bore twin tunnels and a deep mined station. With platforms located 156 feet below grade, the station itself is only the second large-scale mined station in soil the US. Its complex geometry combined with variable soil conditions-sands, silts and clays with slickensides-challenged the designer's to come up with a SEM-based design that addresses the owner's risk, cost and schedule concerns.
机译:位于西雅图南部的南部,信标山站&隧道是Sound Transit南部的侧部的关键部分,提出了新的链接灯具系统。本文介绍了该设计的概述,包括4,300英尺的分段衬砌的孔双隧道和深入的开采站。该站本身只有156英尺的平台,该站仅仅是美国土壤中的第二大型煤矿站。其复杂的几何形状与可变的土壤条件 - 砂,淤泥和粘土与光滑的砂砂,挑战设计师提出了一个基于SEM的设计,这些设计解决了所有者的风险,成本和日程计划问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号