首页> 外文会议>Rapid Excavation and Tunneling Conference >CONSTRUCTION OF A LONG COAL MINE DECLINE IN SOUTHWEST VIRGINIA
【24h】

CONSTRUCTION OF A LONG COAL MINE DECLINE IN SOUTHWEST VIRGINIA

机译:弗吉尼亚州西南部长煤矿下降的构建

获取原文

摘要

In September of 2000, Cowin and Company, Inc., contracted with Paramont Coal Corporation to construct a large decline approximately 820 m (2,700 feet) in overall length at a grade of 8 degrees to the Lower Banner Coal Seam. This paper will discuss the methods used by the contractor and owner to overcome the unique problems required to construct this tunnel in a coal mine environment. The problems include, initial design considerations, equipment selection, ventilation, ground control, control of water inflows, and placement of concrete.
机译:2000年9月,Cowin和Company,Inc。与Paramont Coal Corporation合同,将大约820米(2,700英尺)的整体长度的大幅下降,以8度到下横幅煤层。本文将讨论承包商和所有者克服在煤矿环境中构建该隧道所需的独特问题的方法。问题包括,初始设计考虑,设备选择,通风,地面控制,水流入控制,以及混凝土的放置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号