首页> 外文会议>International conference on software engineering >Explaining the cost of European space and military projects
【24h】

Explaining the cost of European space and military projects

机译:解释欧洲空间和军事项目的成本

获取原文

摘要

There has been much controversy in the literature on several issues underlying the construction of parametric software development cost models. For example, it has been argued whether (dis)economies of scale exist in software production, what functional form should be assumed between effort and product size, whether COCOMO factors were useful, and whether the COCOMO factors are independent. Answers to such questions should help software organizations define suitable data collection programs and well-specified cost models. We use a data set collected by the European Space Agency to perform such an investigation. To ensure a certain degree of consistency in our data, we focus our analysis on a set of space and military projects that represent an important application domain and the largest subset in the database. These projects have been performed, however, by a variety of organizations. First, our results indicate that two functional forms are plausible between effort and product size: linear and log-linear. This also means that different project subpopulations are likely to follow different functional forms. Second, besides product size, the strongest factor influencing cost appears to be team size. Larger teams result in substantially lower productivity, which is interesting considering this attribute is rarely collected in software engineering cost databases. Third, although some COCOMO factors appear to be useful and significant covariates, they play a minor role in explaining project effort.
机译:关于参数化软件开发成本模型建设的几个问题,文献中有很多争议。例如,有人认为(DIS)的规模经济是否存在于软件生产中,努力和产品规模之间应假设有什么功能形式,无论是Cocomo因素是否有用,以及Cocomo因素是否独立。此类问题的答案应该帮助软件组织定义合适的数据收集程序和特定的成本模型。我们使用欧洲航天局收集的数据集进行此类调查。为了确保我们的数据中的一定程度的一致性,我们将对一组空间和军事项目进行了分析,该空间和军事项目代表了一个重要的应用程序域和数据库中最大的子集。然而,这些项目已经由各种组织进行。首先,我们的结果表明,两种功能形式在努力和产品尺寸之间是合理的:线性和对数线性。这也意味着不同的项目亚群可能遵循不同的功能形式。其次,除产品尺寸外,影响成本最强的因素似乎是团队规模。较大的团队导致生产力显着降低,这是考虑到软件工程成本数据库中很少收集此属性的有趣。第三,虽然一些Cocomo因素似乎是有用和重要的协变量,但它们在解释项目努力时发挥着小小的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号