Wanjiazhai Water Control Project is progressed smoothly ever since its commencement. Within the preconstruction stage of almost two years, all the access roads and communications systems within the construction site and that from/to the outside, the heavy silt-laden Yellow River water treatment system, the artificial aggregate production system, the concrete batching plant and the concrete conveying system with telpher conveyer have been completed. The stage 1 Yellow River closure was succeeded in November 1994 and the stage 2 succeeded in December 1995. At present, the foundation pit excavation is almost completed and the concrete placement for the dam and power house is being in progress. Having entered into a busy construction period, a troop of constructors are working even harder and making every efforts in realizing the grand goal for power generation from the first turbine/generator unit in 1998 and that from all the six units in 2000. The design issues mentioned above are what we have learned in design and construction of Wanjiazhai Water Control Project. Criticisms or corrections (if there should have) will be highly appreciated.
机译:自从开始以来,万家寨水控制项目进展顺利进行。在近两年的前施工阶段,施工现场的所有通信系统以及从外面的通信系统,重型淤泥载黄河水处理系统,人工骨料生产系统,混凝土配料厂和采用折座输送机的混凝土输送系统已完成。 1994年11月,1阶段黄河关闭成功,第2阶段成功于1995年12月成功。目前,基础坑挖掘几乎已经完成,大坝和动力屋的具体安置正在进行中。进入繁忙的施工期间,建设者的部队正在努力工作,尽一切努力在1998年从第一台涡轮机/发电机单元实现发电的大目标以及2000年的所有六个单位。设计问题上面提到的是我们在万家寨水控制项目的设计和建设中学到了什么。批评或更正(如果应该有)将受到高度赞赏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号