Design of the diversion tunnels in Ertan Hydroelectric Power Project

机译:ertan水电站工程转移隧道设计

获取原文

摘要

The diversion tunnels are safely and regularly operated more than 31 months since successful river closure on Nov. 26, 1993. It is a comprehensive check and test for the layout of the tunnels axis, discharge capacity, flow diverted during river closure period, conditions of log-passing, type of support of the surrounding rock and others of the design from that operation. It not only demonstrate the reasonableness and Tightness of the philosophy, method and result of the design, but also indicate the design and construction for large hydro-tunnels in China come up to advanced world level.
机译:自1993年11月26日成功的河流封闭以来,转移隧道安全且经常运行31多个月。它是全面的检查和测试隧道轴的布局,放电容量,在河流关闭期间转移的流量,条件记录传递,周围岩石的支持类型以及该操作的设计的其他人。它不仅展示了哲学的合理性和密封性,设计的方法和结果,而且还表明中国大型水隧道的设计和建设达到了先进的世界范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号