首页> 外文会议> >Fisheries Challenges Associated with Ray Gibbon Drive at Riel Pond and the Sturgeon River in St. Albert, Alberta
【24h】

Fisheries Challenges Associated with Ray Gibbon Drive at Riel Pond and the Sturgeon River in St. Albert, Alberta

机译:瑞尔·吉本(Ray Gibbon)驾驶在瑞尔·庞德(Riel Pond)和艾伯塔省圣艾伯特的the鱼河相关的渔业挑战

获取原文
获取原文并翻译 | 示例

摘要

Ray Gibbon Drive, west of St. Albert, Alberta, currently functions as a two lane arterial roadway constructed to alleviate local traffic congestion and provide an alternate commuting route for the residents of St. Albert. Planning took place over 30 years, prolonged primarily because of environmental concerns. After four years of concentrated effort, two roadway sections are now open to traffic, linking St. Albert to west Edmonton and northwest Alberta. rnRay Gibbon Drive passes through Riel Pond (an existing storm pond and former sewage lagoon with contaminated substrate), crosses the slow-moving Sturgeon River and runs adjacent to Big Lake (in Lois Hole Centennial Provincial Park) and Riel Marsh, both sensitive bird habitats. Because of the project’s location, site sensitivities and a long history of public interest, the City of St. Albert required an environmental assessment and federal and provincial agencies (Department of Fisheries and Oceans, Transport Canada, Alberta Sustainable Resource Development and Alberta Environment) required environmental approvals.rnConstruction challenges included: Construction of the roadway over an abandoned landfill with the risk of leakage of leachate; the need to work in Riel Pond (which discharged to the Sturgeon River) while not releasing contaminated bottom sediments, or a non-native fish species (threespine stickleback) discovered in the Pond; scheduling all work outside the period April to July (inclusive) imposed by fish and other breeding wildlife sensitivities (which led to challenging work conditions); and the need to compensate for lost fish habitat as a result of placing piers and abutments in the Sturgeon River. This last challenge was accentuated by the realization that the only suitable location for compensatory fish habitat was a reach of riverbank that had been formerly disturbed to construct one of the Riel Pond containment berms, leading to the need to relocate an entire pond berm. Operational issues included the requirement for the permanent outfall(s) to be screened to prevent release of the very small, non-native threespine stickleback and their eggs. rnMitigative measures and studies included several inventories to characterize fish populations in Riel Pond; designing temporary pond dewatering systems to assist with construction but prevent escape of sediments and non-native fish; characterization of lost riverine fish habitat; creation of 6,000 sq. m. of new pike rearing habitat; and post-construction monitoring of the compensatory habitat for a ten year period (ongoing). This project was closely monitored throughout by very attentive environmental special interest groups concerned with potential impacts to valued natural resources. The road opened for traffic in 2007 with achievement of all environmental protection measures despite the numerous challenges.
机译:Ray Gibbon Drive位于艾伯塔省圣艾伯特以西,目前用作两条车道的主干道,旨在缓解当地交通拥堵并为圣艾伯特居民提供替代的通勤路线。计划进行了30多年,主要是出于对环境的考虑而将其延长。经过四年的不懈努力,两个车道段现已通车,将圣艾伯特省与西部埃德蒙顿和西北艾伯塔省连接起来。 rnRay长臂猿驱动器穿过Riel Pond(一个现有的雨水池塘和以前的污水泻湖,被污染的底物),穿过缓慢移动的St鱼河,并与大湖(在Lois Hole Centennial省立公园内)和Riel Marsh相邻,这两个鸟类都是鸟类的栖息地。由于项目的位置,场地的敏感性和悠久的公共利益历史,圣阿尔伯特市需要进行环境评估,并且需要联邦和省级机构(渔业和海洋部,加拿大运输部,阿尔伯塔省可持续资源开发和阿尔伯塔省环境)环境审批。施工挑战包括:在废弃垃圾填埋场上修建道路,存在渗滤液泄漏的风险;需要在Riel池塘(排入the鱼河)中工作,而又不释放受污染的底部沉积物,或在池塘中发现的非本地鱼类(threespine棘背鱼);将所有工作安排在鱼类和其他繁殖野生动植物敏感性引起的4月至7月(含)的时间之外(这导致工作条件具有挑战性);由于在to鱼河中放置码头和桥台,需要补偿失去的鱼类栖息地。意识到最后一个挑战是,补偿性鱼类栖息地的唯一合适位置是河岸,以前曾受过干扰而建造了一个瑞尔池塘围堰,因此需要重新安置整个池塘。运营方面的问题包括要求对永久性排污口进行筛查,以防止释放非常小的非本地三脊刺背棘及其卵。 rn缓解措施和研究包括几个清单,以描述Riel Pond的鱼类种群。设计临时池塘脱水系统,以协助施工,但防止沉积物和非本地鱼类逃逸;丧失河流鱼类栖息地的特征;创造6,000平方米新的长矛饲养栖息地;以及为期十年的补偿性栖息地的建设后监测(进行中)。整个项目都由非常细心的环境特殊利益集团密切监控,这些利益集团关注对宝贵自然资源的潜在影响。尽管面临诸多挑战,2007年公路通车,并采取了所有环境保护措施。

著录项

  • 来源
    《》|2008年|p.1-16|共16页
  • 会议地点 Toronto(CA)
  • 作者单位

    The City of St. Albert;

    Spencer Environmental Management Services Ltd.;

    ISL Engineering and Land Services Ltd;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 综合运输;
  • 关键词

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号