首页> 外文会议>International Symposium on Lead and Zinc Processing >Recovery of Lead from Zinc Plant Residue by Alkaline Leaching Process Followed by Cementation
【24h】

Recovery of Lead from Zinc Plant Residue by Alkaline Leaching Process Followed by Cementation

机译:碱浸-胶结法从锌渣中回收铅

获取原文

摘要

Present work focuses on recovery of lead from a zinc plant residue (ZPR) in alkaline media. Firstly, Zn and Pb were selectively extracted in NaOH from ZPR containing 56.9% Pb, 0.34% Ag, 3.93% Zn, and 0.88% Cu. Lead was effectively leached in a two-step process. The leach-Ⅰ solubilized 39.5% Pb and 58.5% Zn in 2.0 M NaOH at 25 °C and 10% pulp density in 30 min. Subsequent leaching in 3.0 M NaOH yielded overall extraction of >99% Pb and 67% Zn with stage efficiency of 59.5% Pb and 8.5% Zn. Above 99.9% Pb was recovered from the leach liquor in 30 min at 25 °C and Zn:Pb mole ratio = 1.2:1.0 by cementation using Zn powder. Interestingly silver in the final residue was enriched from 0.3% to 1.17% making it a promising resource of Ag.
机译:目前的工作重点是在碱性介质中从锌厂废渣(ZPR)中回收铅。首先,从含有56.9%铅、0.34%银、3.93%锌和0.88%铜的ZPR中,在NaOH中选择性地提取锌和铅。铅在两步过程中被有效地浸出。浸出-Ⅰ在25°C和10%矿浆密度的2.0 M NaOH中溶解了39.5%的铅和58.5%的锌,在30分钟内溶解。随后在3.0 M NaOH中进行浸出,可获得>99%的铅和67%的锌,阶段效率为59.5%的铅和8.5%的锌。在25°C和锌铅摩尔比=1.2:1.0的条件下,通过使用锌粉进行胶结,在30分钟内从浸出液中回收了99.9%以上的铅。有趣的是,最终残渣中的银从0.3%富集到1.17%,使其成为一种很有前途的银资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号