首页> 外文会议>Journees Siderurgiques Internationales;European Steel Technology Application Days >(Session 08)Improved slab assignment by optimizing caster scheduling with production management
【24h】

(Session 08)Improved slab assignment by optimizing caster scheduling with production management

机译:(会议08)通过优化与生产管理的脚轮调度来改进板坯分配

获取原文

摘要

Over a couple of years ArcelorMittal Fos-sur-Mer has optimized their scheduling processes for steelmaking and casting with two in-house solutions perfectly adapted to their special needs. Due to growing customer requirements for the on-time delivery, new system for steel grades relations rules and increasing maintenance efforts the caster scheduling needed to be modernized to stay competitive. After analyzing the market solutions ArcelorMittal Fos-sur-Mer decided to implement PSImetals Planning for Caster Scheduling.
机译:在几年内,ArcelorMittal FOS-SUR-MER已经优化了他们的炼钢和铸造的调度过程,并用两个内部解决方案完美地适应了他们的特殊需求。 由于客户对准时交付的需求不断增长,钢铁成绩的新系统,维护的努力越来越努力实现现代化以保持竞争力。 分析市场解决方案后,ArcelorMittal FOS-SUR-MER决定实施捷者调度的PSIMetals规划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号