With gradual expansion of the grid, the conventional Supervisory Control and Data Acquisition (SCADA) required additional visualization tools to operate the grid in more efficient manner. Due to low situational awareness, it became difficult for the operator to control the grid in safe and secure manner. This also resulted in isolated blackouts in the grid. In order to enhance the situational awareness, Phasor Measurement Units (PMUs) were installed initially at critical locations identified on the basis of system studies. Upon installation of PMUs, the resolution of data increased from 2 to 4 (SCADA) to 40-60 samples/cycle (PMU). India being geographically diverse and large, the number of PMUs requirement was very high. This large-scale integration of PMUs with existing SCADA posed many technological, geographical, financial and adaptability problems (electricity being concurrent subject of state and centre). This paper elaborates all such integration issues and challenges faced during integration of SCADA-PMU pan India.
机译:随着电网的逐步扩展,传统的监督控制和数据采集(SCADA)需要额外的可视化工具以更有效的方式操作网格。由于弱势意识低,操作员难以以安全和安全的方式控制网格。这也导致网格中的隔离停电。为了提高情境感知,最初在基于系统研究的关键位置安装相量测量单元(PMU)。在安装PMU后,数据的分辨率从2到4(SCADA)增加到40-60个样本/周期(PMU)。印度在地理位置多样化,PMU要求的数量非常高。现有SCADA的这一大规模集成PMU与现有的技术,地理,财务和适应性问题提出(电力正常的国家和中心)。本文阐述了Scada-PMU Pan India整合期间面临的所有此类一体化问题和挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号