【24h】

After the Dust Settles - Ozone System Operation and Optimization After Startup

机译:灰尘沉降后 - 启动后臭氧系统运行和优化

获取原文

摘要

During construction of municipal water treatment ozone systems, the main focus of utility staff, engineers, and contractors is on construction and the complex task of keeping the plant operational during the various stages of construction. Near the end of construction, plant staff may receive equipment specific training from various equipment suppliers and process (treatment) oriented training to prepare plant staff for operation of the ozone system. During startup, plant staff begin ozone process operation with focus on maintaining reliable continuous ozone process operation. Within several months, optimized ozone process operation may be a primary goal. Experiences at several operating ozone water treatment facilities with optimizing ozone dose and ozone production are reviewed in this paper.
机译:在市政水处理臭氧系统的建设中,公用事业人员,工程师和承包商的主要重点是建设和维持工厂在建设的各个阶段的复杂任务。 靠近施工结束,工厂工作人员可以从各种设备供应商和过程(处理)面向培训的设备特定培训,为臭氧系统运行厂人员。 在启动期间,工厂员工开始臭氧过程操作,重点是保持可靠的连续臭氧过程操作。 在几个月内,优化的臭氧过程操作可能是主要目标。 本文综述了具有优化臭氧剂量和臭氧生产的几种操作臭氧水处理设施的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号