首页> 外文会议>International Conference on Electric Technology and Civil Engineering >Study of problems and corrective actions of urban drainage network
【24h】

Study of problems and corrective actions of urban drainage network

机译:城市排水网络问题与纠正措施的研究

获取原文

摘要

The concentration of the inlet wastewater of urban sewage treatment plants is much lower than the expected level in the design stage, mainly because of the problems of construction, management and maintenance of the drainage systems. Through investigation of the urban drainage pipelines, primary problems of drainage network damage, local unreasonable elevation design, pipe blockage and drainage system confusion, etc, were found. Combining the local actual situation, some corresponding engineering and management measures and some feasible suggestions for drainage pipe construction, management and maintenance are put forward.
机译:城市污水处理厂的入口废水的浓度远低于设计阶段的预期水平,主要原因是排水系统的建设,管理和维护问题。 通过调查城市排水管,发现排水网络损坏,局部不合理的海拔设计,管堵塞和排水系统混淆等初步问题。 结合了当地的实际情况,提出了一些相应的工程和管理措施以及排水管施工,管理和维护的一些可行建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号