首页> 外文会议>International conference on hydropower;Waterpower >Hydropower: An Industry Driven to Success Through Recognition of Past Failures
【24h】

Hydropower: An Industry Driven to Success Through Recognition of Past Failures

机译:水电:通过认识到过去的失败来实现成功的行业

获取原文

摘要

During the resurgence of hydropower development in the United States, occurring over the last fifteen years, the industry experienced significant growing pains, driven partly by a desire on the part of project sponsors to maximize returns on their investments. Oftentimes severe time constraints and financial pressures to bring a project on line within a fixed budget, have led many of us as designers to make tradeoffs between construction quality, long-term reliability, and initial capital costs. And while these tradeoffs seem appropriate at the time, as we all know, they can result in difficulties for the project owner down the road.
机译:在美国水电开发的复苏期间,在过去的十五年内发生,行业经历了显着的痛苦,部分地受到项目赞助商的愿望,以最大限度地提高投资回报。 在固定预算中将项目带来一个项目的严重时间限制和财务压力,使我们许多人成为设计师,使施工质量,长期可靠性和初始资本成本之间的权衡。 虽然这些权衡在当时似乎是合适的,但我们都知道,他们可能会导致项目所有者在路上的困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号