首页> 外文会议>EAGE Conference Exhibition;SPE Europec >Production Optimisation for Second Stage Field Development Using ICD and Advanced Well Placement Technology (SPE-113577)
【24h】

Production Optimisation for Second Stage Field Development Using ICD and Advanced Well Placement Technology (SPE-113577)

机译:使用ICD和高级井放置技术进行二级现场开发的生产优化(SPE-113577)

获取原文

摘要

The paper covers the application of new technology drilling and completions equipment in horizontal wells to maximize production and recovery in a thin oil rim. The parallel process applied to the engineering design, drilling operations, real-time decisions, and results are presented. As part of the second stage development of a mature oil field offshore Malaysia, a shallow and previously un-produced target was identified. Initial engineering and reservoir studies identified two horizontal wells as the optimum development strategy. However, to ensure maximum production and recovery a 2,000ft lateral was required. Further detailed studies indicated that for the long lateral to be successful, well placement with respect to reservoir boundaries and fluid contacts, and open-hole sand screens of a high mechanical integrity would be critical.Additionally, in order to ensure even oil production and limit early water and gas production In-flow Control Devices would be required as part of the completion.
机译:本文涵盖了新技术钻井和完井设备在水平井中的应用,以最大化薄油边缘的生产和恢复。介绍了应用于工程设计,钻探操作,实时决策和结果的平行过程。作为近海马来西亚成熟油田的第二阶段开发的一部分,确定了浅层和以前未产生的目标。初始工程和储层研究确定了两个水平井作为最佳发育策略。但是,为了确保最大的生产和恢复需要2,000英尺的侧向。进一步的详细研究表明,对于长期的横向成功,井置于储层边界和流体触点,以及高机械完整性的开孔砂屏将是至关重要的。加法,以确保均匀的油生产和限制作为完成的一部分,需要早期水和天然气生产流量控制装置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号