首页> 外文会议>International UDEC/3DEC Symposium on Numerical Modeling of Discrete Materials in Geotechnical Engineering, Civil Engineering, and Earth Sciences >Mining reinforcement viability determination in situ in strong tectonized rock mass using DKRControl method
【24h】

Mining reinforcement viability determination in situ in strong tectonized rock mass using DKRControl method

机译:使用DKRControl方法,采矿强化活力测定强制构造岩体中的原位

获取原文

摘要

An important stage in Romanian uranium industry development consists in decreasing mining support costs. In order to determine the solution viability, for excavation in strong tectonized rock, there was performed DHG type experimental offset at tow uranium mines of National Uranium Company -Suceava Branch. Two monitoring systems provide an important amount of geotechnical information. These data are used for the computation of the mining excavation stability by DKRControl method, to calibrate and validate the numerical model performed in UDEC code.
机译:罗马尼亚铀产业发展的一个重要阶段包括降低采矿支助费用。 为了确定溶液活力,在强构凝化岩石中的挖掘中,在全国铀公司毛铀矿山进行DHG型实验偏移。 两个监控系统提供了重要的岩土信息。 这些数据用于计算DKRControl方法的挖掘挖掘稳定性,以校准并验证在UDEC代码中执行的数值模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号