【24h】

Cardamom Development:Ensuring Maximum Value While Managing Significant Uncertainties

机译:豆蔻开发:确保管理重大不确定性的同时确保最大值

获取原文

摘要

Shell's 2010 Deep Cardamom discovery in Garden Bank Block 427 provides an example of successful near-field exploration through integrating new technologies, as well as a template for fast-tracking development and first production from discoveries adjacent to existing infrastructure. This approach has challenged the way Shell has managed developments of this scale in the past. However, in the case of the Cardamom Development, the incremental value gain justifies the risk. Shell's Auger Field, online since 1994, has produced >300 MMboe and the tension leg platform (TLP) hosts six subsea fields. By 2007, the field had become Shell's first "super mature" deepwater asset, thereby requiring a different approach to extending hub life, while enabling access to deeper and higher risk, higher reward, upside wells (Fig. 1). Following a 2011 appraisal drilling program, the system selection decision for the Cardamom development was made in the first quarter of 2012 (Fig. 2). However, two appraisal wells remained to be drilled in 2012, so the system selection decision had to account for uncertain results in those wells, as well as risk to costs and timing of key project milestones, the most important of which is delivering first oil production in 2014. Making high dollar investment decisions in the absence of complete information can be perilous; however, it can also provide more flexibility in design and, most importantly, allow for the capture of financial upside from acceleration. To ensure the Cardamom development meets its delivery promise, without eroding value, has required continual reassessment of remaining risks and incorporation of new well information into updated project economics.
机译:Shell 2010年花园银行块427中的深豆蔻发现通过集成新技术,以及用于快速跟踪开发的模板以及从现有基础设施附近的发现的第一次生产,提供了一个成功的近场探索的例子。这种方法已经挑战了壳牌在过去的管理发展中的发展。但是,在豆蔻开发的情况下,增量价值取得了规定的风险。壳牌的螺旋座领域,在线自1994年以来,已经生产> 300 mmboe和张力腿平台(TLP)举办了六个海底领域。到2007年,该领域已成为壳牌的第一个“超级成熟”深水资产,从而需要采用不同的方法来扩展枢纽寿命,同时能够进入更深层次,更高的风险,更高的奖励,更高的井口(图1)。在2011年评估钻探计划之后,在2012年第一季度制定了豆蔻开发的系统选择决定(图2)。但是,2012年仍有两个评估井,因此系统选择决定必须考虑到这些井中的不确定结果,以及重点项目里程碑的成本和时间的风险,最重要的是提供第一石油生产2014年。在没有完整信息的情况下,在没有完整信息的情况下进行高度的投资决定可能是危险的;但是,它还可以提供更大的设计灵活性,最重要的是,允许从加速度捕获财务上行。为确保圆芽发展符合其交付承诺,而不会侵蚀价值,要求持续重新评估剩余的风险并将新井信息纳入更新的项目经济学。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号