Performance evaluation of data transmission in a single and double bus network within the utility substation based on IEC 61850

机译:基于IEC 61850的公用事业变电站单母线网络中数据传输性能评估

获取原文

摘要

Communication between intelligent electronic devices (IED's) is an important feature of a utility substation automation system based on IEC 61850. Time critical information related to fault and overcurrent, under frequency messages for substation automation system (SAS) and the use of IED's from multiple vendors, has opened up issues related to a reliable protection system within the high voltage substation. Early detection of the delay in data transmission over a Generic Object Oriented Substation Event (GOOSE) network is an important step towards identification of problems associated with the dynamic protection system. It is observed that non critical messages adds up the queuing time and delays in the delivery of the messages which could be an issue in the reliable operation of a protection system. In this paper an Optimized Network Engineering Tool (OPNET) model is created, tested and analysed for a single and double bus configuration in detail for the delay encountered in data transfer within a typical zone substation. In order to understand the delay in transmission of packets, a 132/22kV zone substation model is analysed and results are discussed based on GOOSE communication in an IEC 61850 environment. Further, the delay in communication is compared and analysed between a single and double bus system of a 132/22kV substation to determine the best alternative technique available from protection point of view in a SAS network.
机译:智能电子设备(IED)之间的通信是基于IEC 61850的实用变电站自动化系统的一个重要特征。与故障和过流相关的时间关键信息,在变电站自动化系统(SAS)的频率信息下,以及使用来自多个供应商的IED ,打开了与高压变电站内可靠的保护系统相关的问题。早期检测到通用面向对象的变电站事件(鹅)网络上的数据传输延迟是识别与动态保护系统相关的问题的重要一步。观察到非关键消息增加了排队时间并延迟在传递消息中,这可能是保护系统的可靠操作中的问题。本文在典型区域变电站内的数据传输中遇到的延迟,创建了一个优化的网络工程工具(OPNET)模型,并为单个和双总线配置进行了详细的,并在典型的区域变电站内遇到的延迟。为了理解分组传输的延迟,分析了132 / 22kV区变电站模型,并基于IEC 61850环境中的逐个通信讨论了结果。此外,比较通信的延迟,并在132 / 22kV变电站的单个总线系统之间进行比较和分析,以确定可从SAS网络中的保护的视图中获得的最佳替代技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号