首页> 外文会议>Congress of IABSE (International Association for Bridge and Structutal Engineering) >Automated data acquisition to show the actual performance during the construction process
【24h】

Automated data acquisition to show the actual performance during the construction process

机译:自动数据采集,以显示施工过程中的实际性能

获取原文

摘要

In times of workplace digitalization, Building Information Modeling (BIM) is indispensable to the construction industry due to the potential of consistent data tracking and usage. Based on a dynamic working environment as well as specific internal requirements of individual companies, object-oriented planning and processing with BIM-methods still needs adaptation efforts in order to be widely acceptable in the realization phase and on the construction site. Thus, the mapping of actual data on site is deemed the "Achilles' heel" of successful project control. This paper presents a concept for automated data acquisition in complex infrastructure construction sites -especially regarding the processes of road construction and earthworks - with emphasis on different innovative digital methods from which actual values regarding the construction progress can be derived and compared to a target model or digital twin. The objective is to avoid subjective misinterpretations, minimize project risks and turn the project into a more responsible enterprise altogether.
机译:在工作场所数字化的时代,建筑信息建模(BIM)对于建筑行业来说是不可或缺的,因为它具有一致的数据跟踪和使用潜力。基于动态的工作环境以及个别公司的具体内部要求,使用BIM方法进行面向对象的规划和处理仍然需要进行调整,以便在实现阶段和施工现场被广泛接受。因此,将“阿喀琉斯”的实际数据绘制在项目现场被视为是成功的。本文提出了复杂基础设施施工现场自动数据采集的概念,尤其是关于道路施工和土方工程的过程,重点介绍了不同的创新数字方法,从中可以得出施工进度的实际值,并与目标模型或数字模型进行比较。其目的是避免主观误解,最大限度地降低项目风险,使项目成为一个更负责任的企业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号