首页> 外文会议>Congress of IABSE (International Association for Bridge and Structutal Engineering) >Using Data Glasses inside a modern BIM approach for the Planning, Construction and Maintenance of Structures
【24h】

Using Data Glasses inside a modern BIM approach for the Planning, Construction and Maintenance of Structures

机译:使用现代BIM方法内的数据眼镜进行规划,构建和维护结构

获取原文

摘要

The planning methods of Building Information Modeling (BIM) are already used as standard for the planning of buildings and bridges. 3-D models of the structures are created. From these 3-D models, 2-D drawings are derived and made available to the construction site for construction. This derivation of 2-D drawings takes a lot of work and questions the continuous digital planning process. New ways have to be developed how the information is brought from the office to the construction site and how this information is made available digitally to the workers. On the other hand, in-situ collection and post-processing of data is a highly topical issue. The techniques of Virtual and Augmented Reality look promising for that purpose. This article on the one hand shows the potentials of data glasses inside a modern BIM approach for the whole civil engineering context and on the other hand presents concepts as well as first experiences with the use of data glasses for the construction of building components within a BIM work flow. It can be shown, that data glasses are very well suited and promising for the use of transferring planning information to the construction site and vice versa.
机译:建筑信息建模(BIM)的规划方法已被用作建筑物和桥梁规划标准。创建了3-D结构的模型。从这三级模型,推导出二维图纸,并提供给施工现场进行施工。这场二维图纸的推导需要很多工作和持续数字计划过程的问题。必须制定新的方式如何从办公室到施工现场带来信息以及该信息如何向工人提供数字化。另一方面,原位收集和数据后处理是一个高级局部问题。虚拟和增强现实的技术对于该目的而言是有希望的。本文一方面显示了全部土木工程背景的现代BIM方法内的数据眼镜的潜力,另一方面是概念以及使用数据眼镜的概念,以便在BIM内建造建筑部件的数据眼镜工作流程。可以显示,数据眼镜非常适合和希望使用将计划信息转移到施工现场,反之亦然。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号