首页> 外文会议>GSAM 2012 >Production Dynamic Scheduling among Factories Based on Multi-Agent
【24h】

Production Dynamic Scheduling among Factories Based on Multi-Agent

机译:基于多代理的工厂生产动态调度

获取原文

摘要

To solve fluctuation problem in production plan and scheduling among factories, a logic framework of production dynamic scheduling among factories based on multi-agent technology was constructed. In this framework, the production dynamic scheduling multi-agent negotiation rules and mechanism among factories were established. Furthermore, the production dynamic scheduling multi-agent negotiation procedure among factories was investigated. Finally, the simulation system of production dynamic scheduling among factories based on multi-agent is demonstrated and validated by Flexsim software. It has shown the proposed method can improve the adaptability and stability of production plan and scheduling, and provide a support for optimal and dynamic production plan and scheduling among factories.
机译:为了解决工厂生产计划中的波动问题,构建了基于多代理技术的工厂生产动态调度的逻辑框架。在这一框架中,建立了工厂之间的生产动态调度多功能协商规则和机制。此外,研究了工厂之间的生产动态调度多功能协商程序。最后,通过FlexSIM软件对基于多助手的工厂之间的生产动态调度模拟系统。它已经示出了所提出的方法可以提高生产计划和调度的适应性和稳定性,并为工厂的最佳和动态生产计划和调度提供支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号