首页> 外文会议>International Symposium on River Sedimentation >SEDIMENT MANAGEMENT IN HYDROELECTRIC PROJECTS
【24h】

SEDIMENT MANAGEMENT IN HYDROELECTRIC PROJECTS

机译:水电项目沉积物管理

获取原文

摘要

Withdrawal of water from a river into a canal involves the construction of a barrage or a dam across the river depending on whether the river is perennial or not. The design of the reservoir upstream of the dam and of the canal requires consideration of the sediment load carried by the river in case the river is sediment-laden. The basic equations concerning morphological changes in such rivers are discussed with particular reference to computation of reservoir sedimentation. The hydraulics of lined canals carrying wash load is examined from the point of view of limiting transport capacity and changes in frictional resistance. Lastly, the methods of design of sediment extraction devices like settling basins and vortex chambers are presented.
机译:将水从河流中撤回到运河中,涉及在河流上建造拦截或大坝,这取决于河流是否常年。 在大坝和管道上游的水库设计需要考虑河流沉积物的河流沉积物负荷。 特别参考储层沉降的计算,讨论了关于这种河流形态变化的基本方程。 从限制运输能力和摩擦阻力变化的观点来看衬里运河的液压。 最后,提出了沉积物提取装置的设计方法,如沉降盆和涡流室。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号