首页> 外文会议>International Symposium on River Sedimentation >STUDY ON CHANNEL CHANGES AND REGULATION COUNTERMEASURES IN A SHOALY SAND-COBBLE BED REACH BELOW THE THREE GORGES PROJECT
【24h】

STUDY ON CHANNEL CHANGES AND REGULATION COUNTERMEASURES IN A SHOALY SAND-COBBLE BED REACH BELOW THE THREE GORGES PROJECT

机译:三峡工程低于三峡工程的浅谈渠道变化及调控对策研究

获取原文

摘要

The operation of the Three Gorges Project has caused general bed degradation and morphological adjustment of the downstream channel. This paper analyses the channel change patterns and navigation conditions in a sand-cobble bed reach below the Three Gorges Dam. The potential channel changes of the reach are predicted and key technologies for physical model tests studied. Channel regulation countermeasures are proposed to solve the navigation problems of the reach.
机译:三峡工程的运作导致下游通道的一般床降解和形态调整。 本文分析了三峡大坝下方砂皮床的通道变化模式和导航条件。 REACH的潜在信道变化是预测的,并研究了物理模型测试的关键技术。 提出了渠道调节对策,以解决REACH的导航问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号