Job-Shop Scheduling model for optimization of the double track railway scheduling: (Case study: Solo-Yogyakarta railway network)

机译:双轨铁路调度优化的工作店调度模型:(案例研究:独奏日喀尔塔铁路网络)

获取原文

摘要

Scheduling trains in order to minimize the traveling time is a challenging optimization problem. Delay may occur due to the bottleneck or many trains need to use the same track at the same time. These delays increase the journey time and may cause secondary delays to the other trains in the network. Double track railway scheduling can be modelled as a Job-Shop Scheduling Problem that can be achieved by considering the train trips as jobs which will be scheduled on tracks. This research is focus on scheduling trains in order to minimize the delay time. First Come First Serve (FCFS) dispatching rule is used to calculate the traveling time at each block section by sequencing the trains in order of starting time. The other rule is priority queue to solve the bottleneck problem by assigning the block section to the highest priority train. The simulation result is that the proposed model produce a less optimal schedule than the actual schedule due to the great average delays but the number of the delayed trains are less.
机译:调度列车为了最小化行驶时间是一个具有挑战性的优化问题。由于瓶颈或许多火车可能需要同时使用相同的轨道可能发生延迟。这些延迟增加了行程时间,可能导致网络中的其他列车延迟。双轨铁路调度可以作为作业商店调度问题建模,这可以通过将列车旅行视为将在轨道上计划的作业来实现。该研究专注于调度列车,以便最小化延迟时间。首先来第一次服务(FCF)调度规则用于通过按开始时间顺序排序列车来计算每个块部分的行进时间。其他规则是优先级队列来解决瓶颈问题,通过将块部分分配给最高优先级列车。仿真结果是,由于较大的平均延迟,所提出的模型产生比实际时间表更少的最佳时间表,但延迟列车的数量较少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号