首页> 外文会议>Life-of-Mine (Conference) >Bed Load Losses from Experimental Plots on a Rehabilitated Uranium Mine in Northern Australia
【24h】

Bed Load Losses from Experimental Plots on a Rehabilitated Uranium Mine in Northern Australia

机译:澳大利亚北部康复铀矿的实验地块床上负荷损失

获取原文

摘要

Ranger Uranium. Mine., surrounded by Kakadu National Park is located in the Alligator Rivers Region (ARR) in the wet-dry monsoonal tropics, 250 kin east of Darwin, Northern Territory. A trial landform (TLF), measuring approximately 200 m by 400 m (8 ha) was constructed during late 2008 and early 2009 by Energy Resources of Australia (ERA), adjacent to the northwestern wall of the tailings storage facility at the Ranger Mine, A collaborative research program involving the Environmental Research Institute of the Supervising Scientist (eriss) and ERA, has been underway to measure long-term (five to ten year) rainfall, run-off, sediment and solute losses, seepage and vegetation establishment on the TLF (Saynor et al, 2012; Lowry et al, 2014). This paper reports on bed load losses from four erosion plots built on the TLF. These were achieved by physically isolating approximately 30 x 30 m areas from the surrounding landform on three sides with sidewalls along with an open polyvinyl chloride (PVC) pipe on the downslope side. Each plot was instrumented with a range of sensors. Two plots, 1 and 2 were constructed on waste rock material, while plots 3 and 4 were constructed on waste rock mixed with approximately 30 per cent lateritic material. Plots 1 and 4 had tube stock planted in early 2009, and plots 2 and 3 were initially planted by direct seeding in July 2009 and were infill planted with tube stock in January 2011.
机译:游侠铀。矿山。,被喀拉德国家公园所包围,位于南部达尔文湿干季风热带地区(Arr),位于达尔文,北领地达尔文东部250家。试验地貌(TLF),在2008年底和2009年初制造了约200米,由澳大利亚(时代)的能源资源,毗邻尾矿储存设施的西北墙,涉及监督科学家环境研究所(ERISS)和ERA环境研究所的合作研究计划,已经开始衡量长期(五到十年)降雨,沟渠,沉积物和溶质损失,渗流和植被建立TLF(Saynor等,2012; Lowry等,2014)。本文报告了在TLF上建立的四个侵蚀地块的床上负荷损失。这些通过将大约30×30米的区域与侧壁的三个侧面与侧壁一起与侧壁一起与侧壁一起与下坡侧的开放聚氯乙烯(PVC)管隔离来实现。每个绘图都是用一系列传感器进行仪器。在废岩材料上构建了两个图,1和2,而在与大约30%的后胞材料混合的废岩上构建了图3和4。情节1和4在2009年初种植管股,最初通过2009年7月的直接播种来种植图2和3,并在2011年1月填充管股。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号