首页> 外文会议>International Conference on Materials Science and Computational Engineering >The Optimization Research of Outburst Prevention Measures of Coal Roadway Excavation Area in South Second Underground Mine of Liziya
【24h】

The Optimization Research of Outburst Prevention Measures of Coal Roadway Excavation Area in South Second Underground Mine of Liziya

机译:Liziya南第二地下矿井煤道路挖掘区爆破预防措施的优化研究

获取原文

摘要

In order to comprehensively control south second underground mine of Liziya and accident-prone gas outburst, low coal seam permeability coefficient, disaster caused by outburst and following prevention with and high cost and so on, the targeted outburst prevention optimization measures in coal roadway excavation area is puts forward, by applying independently developed " drilling and slotting integration" hydraulic slotting equipment in the process of drilling construction, making coal seam of pre-drainage area carry on antireflection, exposure area of drilling in coal is increased, achieve the purpose of increasing coal seam permeability and drilling extraction radius, improve extraction effect and shorten reaching standard time of gas extraction, provide a more complete solution for outburst prevention measures of underground area in mine.
机译:为了全面控制南第二地下矿井利润和易于易发气体爆发,煤缝渗透系数低,爆发造成的灾害和预防和高成本等,煤道路挖掘地区有针对性的突出预防措施如提出,通过在钻井结构过程中施加独立开发的“钻孔和槽集成”液压打孔设备,使煤层贯穿抗射流,煤炭钻孔曝光面积增加,达到升高的目的煤缝渗透性和钻孔提取半径,提高提取效果和缩短达到标准的气体提取时间,为矿井地下地区的突出预防措施提供了更完整的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号