首页> 外文会议>ISMSE 2011 >Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine
【24h】

Mining Plan Optimization Based on Linear Programming in Shirengou Iron Mine

机译:基于石头武铁矿线性规划的采矿计划优化

获取原文

摘要

Faced with the difficult situation of the joint operation of open pit and underground mining in transition period in Shirengou Iron Mine, a suitable linear programming mathematical model of mining plan was established and synthesis optimization results were obtained, which would increase the overall economic effect of the mining operation during the transition period, while the limited reserves and ore quality control were entirely considered. A pronounced economic benefit was achieved by the project optimization. This mathematical model can be widely used in mining process to control the quality and quantity equilibrium of ore output, comprehensive utilize some waste rock and optimize the mining plan.
机译:面对开放坑和地下采矿的联合运作的难度局势,在石源铁矿过渡期,建立了合适的采矿计划的线性规划数学模型,获得了合成优化结果,这将提高其整体经济效益在过渡期间采矿操作,而完全考虑有限的储量和矿石质量控制。项目优化实现了明显的经济效益。该数学模型可广泛应用于采矿过程以控制矿石输出的质量和数量平衡,综合利用一些废物岩石,优化采矿计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号