首页> 外文会议>SPE Nigeria Annual International Conference and Exhibition >Alerting Excessive Choke Increase Impact on Water and or Gas Production Responses Vs.Oil Cumulative-PredOPT
【24h】

Alerting Excessive Choke Increase Impact on Water and or Gas Production Responses Vs.Oil Cumulative-PredOPT

机译:警报过度扼流圈会增加对水和或天然气生产响应的影响vs.oil累积预测

获取原文

摘要

Angola's O&G business environment has shifted from Exploration to Production,and from Drilling to Well Intervention for obvious reasons of current and projected state of the E&P industry where operations are squeezed by volatile oil prices and higher operating costs.Operators in quest to maintain production plateau resolve in excessive choke increase.Therefore,a focus on predicting resulting HWcut and or HGor over time becomes significant as 75% of fields are under fluid injection for a balance voidage replacement.This study uses fields in Angola for conventional diagnostics decline curve analysis.Using plots of cumulative oil vs GOR,Pressure,Water cut and choke,to analyses the water and or gas production responses vs.oil cumulative to the excessive choke change.To have a complete sense of the impact,PI is included to consider oil production with respect to pressure drawdown.This study where mainly focused in clastic deposits.This approach may help anticipate the production of water due to excessive increase in choke sizes.It is expected that depending on the provenance of the water,it is concluded that excessive choke variation can be problematic in the future.A possible warning or alert is generated for any future choke change and hence oil production is optimized.An excel macro coding-PredOPT(Prediction and Optimization)is developed for the analysis and plugged-in to commercial software for the ease of applicability.
机译:安哥拉的O&G商业环境已经从探索转向生产,并从钻井到井中干预E&P行业的当前和预计状态的明显原因,其中经营被挥发性油价和更高的运营成本挤压。寻求维持生产高原的运营者因此,过度扼流量增加。因此,随着时间的推移,预测结果的HUCUT和或HGOR的重点是75%的字段是流体注射的余额替代。本研究使用安哥拉的字段进行传统诊断曲线分析。累积油与GOR,压力,水切割和扼流圈,分析水和燃气生产响应vs.oil累积对过度扼流圈的累积变化。要具有完全的影响感,所包括PI以考虑石油生产压力绘制。这项研究主要集中在碎屑存款中。这种方法可能有助于预期水杜的生产e以过度增加扼流尺寸。预期取决于水的出处,得出结论是,过度扼流变化在未来可能是有问题的。对于任何未来的扼流圈改变,都会产生警告或警报优化。Excel宏编码 - 预测(预测和优化)是为分析和插入商业软件开发的,以便于适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号