首页> 外文会议>International Nuclear Atlantic Conference >CONTINGENCY PLANNING FOR NUCLEAR PLANTS: AN APPROACH FOR USE IN INDUSTRIAL PLANTS AND HARZADOUS PRODUCTS STORAGE FACILITIES
【24h】

CONTINGENCY PLANNING FOR NUCLEAR PLANTS: AN APPROACH FOR USE IN INDUSTRIAL PLANTS AND HARZADOUS PRODUCTS STORAGE FACILITIES

机译:核电站的应急计划:工业设备和Harzadous产品存储设施中使用的方法

获取原文

摘要

When an earthquake stroke Lisbon in 1755, followed by a tsunami and a great fire, Marquis of Pombal implemented a framework to assist victims, tackle the fires that followed the quake, provide physical protection to heritage and disease control, among other actions. This pioneering coordination action was deployed during the emergency involving several actors within their jurisdiction, but without prior planning.
机译:当一个地震中风里斯本在1755年,随后是海啸和大火,庞巴尔的侯爵实施了一个框架,以协助受害者,解决地震之后的火灾,为遗产和疾病控制提供物理保护,以及其他行动。 在涉及其管辖范围内的若干行动者的紧急情况下部署了这种开创性的协调措施,但没有先前的规划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号